First, thanks for the website and all the ideas. We would like to show our build as a sort of repayment. "We" are : my son Robert, 29 yrs old, sheet metal worker and our main welder. My son Ryan 26 yrs old who is a machinist. As for me, I just retired from 36 years as lab tech/production supervisor/superintendent at The chemical company. We have been drag racing and building our own dragsters since Robert was 8. So besides their full time jobs(with OT), drag racing on weekends, drag racing side jobs, and taking care of their homes, they are pretty booked. I try to organize everything during the day to make the most of their time in the evenings. So let the build begin.
 

Attachments

  • 20130730_093058.jpg
    20130730_093058.jpg
    123.3 KB · Views: 34
8/15/13 - Day 1

Main rails are 3 x 5's with the rest of the floor 2 x 2's.
 

Attachments

  • 20130815_160343.jpg
    20130815_160343.jpg
    109.9 KB · Views: 23
  • 20130815_175957.jpg
    20130815_175957.jpg
    113.7 KB · Views: 20
8/16/13 - Day 2

Floor Complete
 

Attachments

  • 20130816_165702.jpg
    20130816_165702.jpg
    111.7 KB · Views: 27
8/23/13 - Day 9

Took 4 of us to lift and slide the floor on truck. We used oak boards between the truck frame and floor. Made our own u bolts with all-thread and 4 side plates to keep it all in alignment. Hopefully we are not too rigid.
 

Attachments

  • 20130823_183313.jpg
    20130823_183313.jpg
    118.8 KB · Views: 19
  • 20130823_183329.jpg
    20130823_183329.jpg
    114.6 KB · Views: 33
9/2/13 - Day 19

Wall one complete. Its made out of 1.5 x 1.5 tube. We tack welded the tube on the left side to the uprights to keep them in line till the were welded I place on the frame then it was removed.
 

Attachments

  • 20130902_163043.jpg
    20130902_163043.jpg
    108.6 KB · Views: 29
9/5/13 - Day 22

Not as smooth as I hoped but one wall is up.
 

Attachments

  • 20130905_152413.jpg
    20130905_152413.jpg
    120.8 KB · Views: 23
  • 20130905_152424.jpg
    20130905_152424.jpg
    125.5 KB · Views: 32
9/6/13 - Day 23

Wall two is up and roof supports going in.
 

Attachments

  • 20130906_184004.jpg
    20130906_184004.jpg
    123.9 KB · Views: 25
  • 20130906_184037.jpg
    20130906_184037.jpg
    123.8 KB · Views: 25
9/22/13 - Day 39

The wall were mainly tack welded so over the last week, everything got fully welded then all surface welds had to be ground smooth. In the meantime, we had to cover it with a tarp. What a pain! The box will be almost 26 ft long.

For leveling jacks, we went with HWH system designed for a Ford chassis. We only had to modify the rear crossbrace as it was too long. 9000 lbs jacks up front, 6000lbs in the rear. Our frame is taller then the Ford so the jacks are 5 inches off the ground further then designed but nothing a 4 x 4 pad won't fix if the ground is very bad. This thing will mainly be at drag strips which are about as flat as you can get!
 

Attachments

  • 20130911_100942.jpg
    20130911_100942.jpg
    116.1 KB · Views: 12
  • 20130922_114817.jpg
    20130922_114817.jpg
    118.2 KB · Views: 23
  • 20130922_172303.jpg
    20130922_172303.jpg
    112.7 KB · Views: 26
9/25/13 - Day 42

For the roof underlayment, we used 3/4" plywood so if we want to, we can walk on it as an observation deck. We made our box 101" wide to get the most space possible. My suggestion to anyone thinking of a similar build, go with 96". A 4 x 8 sheet will not work for our roof, floor or ceiling without adding a small filler piece. That sucks.
The lower compartment rear wall welded in place. Trailer hitch was fabricated and bolted in place earlier.
 

Attachments

  • 20130925_192233.jpg
    20130925_192233.jpg
    123.5 KB · Views: 28
  • 20130925_192219.jpg
    20130925_192219.jpg
    119.7 KB · Views: 36
9/26/13 - Day 43

In our "spare" time we have been screwing and tack welding in sheet metal under the floor tubes. That's to hold the rigid insulation and to act as the lower compartment ceiling. I did a lot of this welding so not all of them are the prettiest. Glad it all gets covered and no one will ever see them. I can MIG something like this but I don't do any of the structural stuff. All the edges will be filled with Great Stuff when the insulation goes in to seal it all.
 

Attachments

  • 20130926_191116.jpg
    20130926_191116.jpg
    109.8 KB · Views: 36
  • 20130926_191051.jpg
    20130926_191051.jpg
    109.7 KB · Views: 42
Very nice. Having extra minds to help solve problems is a big plus. How long have you been working on it? How big of a race trailer will you be pulling? Keep up the good work and for sure keep the pictures coming.
 
looks great. just keep making sure every thing stays straight. i made mine 102" wide. ran roof boards crossways. had more seams but. i was worried about seam down center.
 
Very nice. Having extra minds to help solve problems is a big plus. How long have you been working on it? How big of a race trailer will you be pulling? Keep up the good work and for sure keep the pictures coming.

Ideas have been in the planning stage for a couple years now but each post states the date the work was done. So we have only been working on it 7 weeks.

Trailer is a 34 footer. We are going to be looong.
 
9/27/13 - Day 44

While the rest of the box is not ready for siding, we did the back panels to get a feel for it. We are using 3M'S 560 adhesive to hold the panels to the steel and using UHB tape at the panel to panel lines. We wanted to use the tape on the seams so they would be clean with no adhesive spilling out. We sanded each upright and cleaned everything with lacquer thinner. It suggests roughing up the panels but we did not. The plastic film on the panels was peeled back to expose the edge but will not be pulled total off till we are totally finished. Its early in the process, but the tape wins over the adhesive. Once the panel is pressed into the tape, you are not going to move it. Better have it in the right spot. With the adhesive, the panel will side all over the place so you have to come up with a way to hold it in place. We clamped tubing under the bottom rail so the panel rested on it and lightly clamped the open sides. Didn't get pics of this process but will when we get to the rest of the box.
 

Attachments

  • 20130926_191023.jpg
    20130926_191023.jpg
    114.3 KB · Views: 33
  • 20130927_135005.jpg
    20130927_135005.jpg
    105.3 KB · Views: 31
  • 20131001_173416.jpg
    20131001_173416.jpg
    109 KB · Views: 27
  • 20131001_173358.jpg
    20131001_173358.jpg
    100 KB · Views: 21
9/30/13 - Day 47

Using liquid nails, we glued the one piece aluminum to the roof and used 2 x 4's and bar clamps to hold it in place. Since the roof is 101" and the aluminum 102.5", I bent it over the edge the next day. Not pretty but the trim will cover it. Didn't want to do this now but with several days of rain coming and now several holes in our tarp, it needed to be done.
 

Attachments

  • 20131001_142027.jpg
    20131001_142027.jpg
    131.3 KB · Views: 27
  • 20131001_142128.jpg
    20131001_142128.jpg
    108.5 KB · Views: 25
10/6/13 - Day 60

We have spent the last week dodging rain drops and trying to get the lower compartments welded into place. The generator goes in the compartment behind the drivers side rear tires. We used perforated plate on the back wall and floor to let air to circulate in that area. The rest will mainly be 18 gauge sheet metal with 16 gauge in the wheel wells.
 

Attachments

  • 20131006_103321.jpg
    20131006_103321.jpg
    108.9 KB · Views: 24
  • 20131006_143406.jpg
    20131006_143406.jpg
    125.4 KB · Views: 26
  • 20131006_103244.jpg
    20131006_103244.jpg
    116.8 KB · Views: 22
10/10/13 Day 57

Got the propane grill mocked up.
 

Attachments

  • 20131010_183106.jpg
    20131010_183106.jpg
    113.5 KB · Views: 36
  • 20131010_154233.jpg
    20131010_154233.jpg
    110.2 KB · Views: 35
10/12/13 Race Day

We have been trying for a couple years to go faster than 4 seconds in the 1/8 mile and we finally did it. In 660 ft Robert did 3.99 seconds @ 175 mph. Its a 402 cu. in. supercharged small block chevy in a chassis we built. I do the paint work.
 

Attachments

  • AsphaltWarsTRP2johnboy101213.jpg
    AsphaltWarsTRP2johnboy101213.jpg
    97.8 KB · Views: 6
10/15/13 Day 62

A couple days of gluing/taping body panels in place. We tack welded a piece under the bottom rail so we could place the panel straight and to hold it till we lightly clamped it. We placed the panel in place, marked door/window location and cut most of them out before gluing the panel up. Still have to cut out the door and the wheel wells but I do like the fender skirt look!. Let it sit at least an hour before we unclamped it and did the next panel. We bounced from side to side and in set up time, we got the tanks installed. Still have the stuff around the cab to do but rain for the next couple days will stop us. We could use a day off any way.
 

Attachments

  • 20131013_125353.jpg
    20131013_125353.jpg
    111.3 KB · Views: 34
  • 20131014_131037.jpg
    20131014_131037.jpg
    109.5 KB · Views: 37
  • 20131014_131027.jpg
    20131014_131027.jpg
    100.9 KB · Views: 32
  • 20131015_175932.jpg
    20131015_175932.jpg
    118.1 KB · Views: 39

Try RV LIFE Pro Free for 7 Days

  • New Ad-Free experience on this RV LIFE Community.
  • Plan the best RV Safe travel with RV LIFE Trip Wizard.
  • Navigate with our RV Safe GPS mobile app.
  • and much more...
Try RV LIFE Pro Today
Back
Top