Search results

  1. 96

    96 377 pete frame stretch started

    getting closer Finally got slideout done and sealed and functional
  2. 96

    96 377 pete frame stretch started

    96 377 pete doug slide pics We stretched the frame and removed one rear axle
  3. 96

    96 377 pete frame stretch started

    96 377 pete doug slide pics Cutting the hole wsa the scariest part I think
  4. 96

    96 377 pete frame stretch started

    We made mounts to do away with air ride no room in sleeper boot for air rde
  5. 96

    96 377 pete frame stretch started

    Walk through cut and sleeper boot ring fitted
  6. 96

    96 377 pete frame stretch started

    We also went under the truck and removed the air lines and plugged fittings off @ the tanks
  7. 96

    96 377 pete frame stretch started

    We made mounts for my cab peterbilt mounts were outrageous the sleeper boot for a unibilt cab has no give for airide cab with fixed box.
  8. 96

    96 377 pete frame stretch started

    The box is not mounted on the truck it's 8 ft wide. Still have to cut walk through hole and paint front wall install boot ring and paint the truck wall and roof
  9. 96

    96 377 pete frame stretch started

    productive Saturday Removing sleeper and placing box
  10. 96

    96 377 pete frame stretch started

    sleeper removal and box mount day 1 Day 1 of 5 probably to cut sleeper hole and paint the front wall and roof and back wall of truck finish mounting and attach sleeper boot
  11. 96

    96 377 pete frame stretch started

    sleeper removal and box mount day 1 Probably will be 5 days total to mount the paint front wall and roof and back wall of the truck and cut hole and attactch sleeper boot
  12. 96

    45 foot T2000 Conversion with Camper

    Looks good I'm doing the same thing for drag racing I'm building a 96 377 Pete with a FRP 26 ft box I'm on here 96377petedoug
  13. 96

    96 377 pete frame stretch started

    Finally p/ up a clean 26 ft 7ft inside height FRP box
  14. 96

    96 377 pete frame stretch started

    Not yet probably won't pull anything till it's close to finished
  15. 96

    96 377 pete frame stretch started

    The wheel base is 280 inches
  16. 96

    96 377 pete frame stretch started

    Finally done with the frame time for a box
  17. 96

    96 377 pete frame stretch started

    They came with the rear we put under it
  18. 96

    96 377 pete frame stretch started

    Finally started my conversation after having my truck for 3 years putting 26 ft box on after frame stretch is done to pull 28 ft trailer with race cars

Try RV LIFE Pro Free for 7 Days

  • New Ad-Free experience on this RV LIFE Community.
  • Plan the best RV Safe travel with RV LIFE Trip Wizard.
  • Navigate with our RV Safe GPS mobile app.
  • and much more...
Try RV LIFE Pro Today
Back
Top