Search results

  1. Rusty

    Comment by 'Rusty' in media 'ready to rock and roll'

    final shot...complete
  2. Rusty

    Comment by 'Rusty' in media 'flooring upgrade 3'

    new vinyl to match the floor....same as my office...;)
  3. Rusty

    Comment by 'Rusty' in media 'flooring upgrade 2'

    Commercial pemko threshol trimmed for installation ....holds down the back edge of the carpet and provides a 3/8" riser for the door to close against
  4. Rusty

    Comment by 'Rusty' in media 'flooring upgrade'

    new commercial carpet installed
  5. Rusty

    Comment by 'Rusty' in media 'protecting the upper from overspray while doing the lower'

    masking installed for the bottom section finish coat...note the masking tape hangers...in place to hold the masking paper flap out away from the body to help avoid overspray on the top section already complete.
  6. Rusty

    Comment by 'Rusty' in media 'trimmed out and loaded'

    rear shot lights ablaze
  7. Rusty

    Comment by 'Rusty' in media 'exterior cleaned and filled'

    rear area filled and sanded...ready for masking
  8. Rusty

    Comment by 'Rusty' in media 'after prime and paint w/o hardware and lights'

    completed paint with clearance lenses installed....nice and clean
  9. Rusty

    Comment by 'Rusty' in media 'trailer ball at same height as on truck'

    Stairs in the up position with the trailer hitch installed...ready for the boat
  10. Rusty

    Comment by 'Rusty' in media 'stinger continued through stairs'

    A thin layer of teflon was installed on top of the stinger for the stair assemble to slide on as it folds into the confined area.
  11. Rusty

    Comment by 'Rusty' in media 'side shot'

    all parts just to the edge of the tailgate
  12. Rusty

    Comment by 'Rusty' in media 'first step drawdown'

    Two steps down with the modified third step still in the up position. It was shortend to ride over the top of the stinger extension off the reciever.
  13. Rusty

    Comment by 'Rusty' in media 'tailgate down over stairs'

    Notice how all parts extend just to the edge of the tailgate. The stinger was calced out to take the weight of the tongue of my boat...310#...calcs done to 400#.
  14. Rusty

    Comment by 'Rusty' in media 'last step folded down'

    All three modified steps extended. With 100# in the bags the stairs set up 4" off the deck.
  15. Rusty

    Comment by 'Rusty' in media 'stairs install 001.jpg'

    This is the greywater tank with the modified stair assembly on the deck fitted for the 2" reciever
  16. Rusty

    Comment by 'Rusty' in media 'DSC01599.JPG'

    Notice the lining of the area. It's the steel skin off of a refrigerator cut and fitted into the refer hole to give a little extra protection in case of a fire. the caulking is fire caulking...along every seam and around the outlet...with a metal cover.
  17. Rusty

    Comment by 'Rusty' in media 'DSC01597.JPG'

    This is the upper section and cooling sinc with the two computer fans for assistance in removing the heated air from above the refer and off the coils

Try RV LIFE Pro Free for 7 Days

  • New Ad-Free experience on this RV LIFE Community.
  • Plan the best RV Safe travel with RV LIFE Trip Wizard.
  • Navigate with our RV Safe GPS mobile app.
  • and much more...
Try RV LIFE Pro Today
Back
Top