And so it begins....

Got a few minutes of time off and a break in the weather to get some truck mechanical work done....been putting off the box part as i need to figure a way to get the thing on the back of the truck as i got a quote from a crane service and it just about made me sick.
 
Well a small move forward today as i managed to get the second driveshaft hanger drilled/mounted....not the progress i had hoped for as the weather (yes that is snow on the ground and we are around -10c) and work are slowing me down.

On the upside, the 5th wheel is finally gone and i think i found someone with a crane to put the box on!
 

Attachments

  • 20221214_131148.jpg
    20221214_131148.jpg
    113.5 KB · Views: 13
Well finally got a break in the weather and i'm home at the same time....lol.

Air lines going getting put in, new leveling valve, etc.....

Old rear driveshaft off and moved to original position so i can tackle the mid shaft next...

Then ill run the new wirring harness as i hate tracking bad wires.....lol.

Once thats done i can get the box on as anything after like brake chambers, bags etc can be done later with no real struggle.
 

Attachments

  • 20230328_141736.jpg
    20230328_141736.jpg
    116.8 KB · Views: 13
  • 20230328_141748.jpg
    20230328_141748.jpg
    116.2 KB · Views: 11
Well driveshaft is gonna work fine i just have send it out to be welded (i dont have enough hydro power to run enough welding heat).

New brake combo valve is in, brake tubing is all run and now just replacing brake chambers which is kicking the cr@p out of me....dont know who put them on last but people need to remember that they dont need to crank the mounting bolts on at 1000flbs.

Wont be long now before i can turn my attention to the box....cant wait....nor can the wife as shes tired of looking at it in the driveway....lol.
 

Attachments

  • 20230410_151617.jpg
    20230410_151617.jpg
    116.3 KB · Views: 15
  • 20230410_151550.jpg
    20230410_151550.jpg
    115.4 KB · Views: 13
Well today was the day to start doing something with the habitat.....wife is itching to get making cabinets etc. So subfloor went in....3/8 OSB on top of the aluminum reefer floor, then 1.5" of high density foam, then 5/8 tung and groove plywood......gives us about 5" of insulation on the floor.

Next will be the ceiling and then something to cover the walls.
 

Attachments

  • 20230514_134216.jpg
    20230514_134216.jpg
    104.7 KB · Views: 14
  • 20230514_165701.jpg
    20230514_165701.jpg
    112.1 KB · Views: 16
Well nothing crazy exciting but front of box getting cleaned off of parts so we can lift it onto the truck this week.....good thing no one was around to film this or we would have ended up in the " why women live longer than men" file.....lol.
 

Attachments

  • 20230630_181833.jpg
    20230630_181833.jpg
    116.9 KB · Views: 11
Of course one now must plug the holes left behind.....some aluminum olate, aluminum ribets and some SikaFlex 221....should be sealed...hope i never have to remove them....lol.
 

Attachments

  • 20230702_153702.jpg
    20230702_153702.jpg
    117.9 KB · Views: 12
Well huge step forward....box got put on....finally.....i dont know who's happier, me or the wife because she gets here parking spots back....lol.
 

Attachments

  • 20230707_124614.jpg
    20230707_124614.jpg
    100 KB · Views: 16
Inside of the box is starting to take shape....i have the window openings, garage openjng etc framed in.....roof is reframed....now spray foam and sheeting next.....finally getting back to where we started last spring when the wife discovered the wet interior.
 

Attachments

  • 20231227_114652.jpg
    20231227_114652.jpg
    113.3 KB · Views: 14
Looking a lot drier and a lot warmer.

Fun working outdoors in winter, eh?
 
Slow going but everything frames out, ceiling wired and waiting on the spray foam guys to come do their magic today. If everything goes as planned the ceiling will go up in the next few weeks.
 

Attachments

  • 20240602_100527.jpg
    20240602_100527.jpg
    102.2 KB · Views: 13
Wired and spray foamed.....was hoping they would fill the ceiling completely.....guess thats what happens when your not home to supervise.
 

Attachments

  • 20240608_135058.jpg
    20240608_135058.jpg
    106.3 KB · Views: 11
Well, finally got the ceiling completely spray foam insulated...had the guys comeback and finish the job as it was cheaper than doing it myself. Next thing on the list is to sheet the interior, than we will be back to making progress instead of recovering from were we where before the moisture surprise.
 

Attachments

  • 20240719_121242.jpg
    20240719_121242.jpg
    111.1 KB · Views: 13

Try RV LIFE Pro Free for 7 Days

  • New Ad-Free experience on this RV LIFE Community.
  • Plan the best RV Safe travel with RV LIFE Trip Wizard.
  • Navigate with our RV Safe GPS mobile app.
  • and much more...
Try RV LIFE Pro Today
Back
Top