Alright, let the games begin (sorry i travel for a living so things move very slowly sometimes).....finally got the 10 foot doner frame and support plates all cut, fitted, bolted up. (Before anyone says anything its surface rust i live in a 4 season area and our goverment loves salt for winter roads)
Next will be to have someone come and weld it together. (I can weld but this is a job for a certified welder).
The following stage, after welding will be to move the axles back one position, so front to the rear position and rear back the equal amount. When said and done it will leave us about 6.5ish feet of over-hang.
|