Tonight I completed the remainder of the floor joists, adding the 1/2 inch strippage to the bottom sides to hold the rigid insulation in place. Loaded my welder and bottle via the lift gate for some welding to the curb that I hadn't finished yet. That'll happen tomorrow night.
|