I absolutely don't want anything to freeze, and it's been -35 here before. I also want to be able to access the water lines and electrical in case of failure. I also fear fire especially with that closed cell insulation. Therefore, water and electrical are going to be run just inside of the exterior walls, in the interior space inside specially built baseboard (pipe chase). I'm still a ways away, but I'm hoping to be on that before the weather starts changing in September.
|