Okay, so here's my latest progress with phote's included.......
All joists up to the last 9 feet or so are in and all hangers are installed......next step is to attach brackets (already bought) that will hold the joists straight and to the floor. Will also attach a few brackets to the rim to provide maximum sheer for the floor sliding on top of the deck.
|