View Single Post
Old 06-09-2019, 11:22 AM   #17
hoodoo valley
Senior Member
 
Join Date: Feb 2019
Location: void
Posts: 156
Default

Here's the curb welded in place and photo's of the epoxying. I'm doing fiberglass mats. There will be a 2x6 framed floor on top of this, with the rigid insulation a half inch off the floor below. I was contemplating providing a ventilation path via a fan (already have the fan) to circulate air if water ever leaked under these two floors. Unsure if it's needed or not. I'm sure someone will give superb advice after the floor is built! (smiling)

By the way, one of these phote's is of the truck when I first embarked on this mission.
Attached Thumbnails
IMG_20190608_132717691_HDR.jpg   IMG_20190608_132614499.jpg   008.JPG   MVIMG_20190608_132547871.jpg  
hoodoo valley is offline   Reply With Quote