View Single Post
Old 01-20-2016, 02:01 PM   #3
solo318
Senior Member
 
solo318's Avatar
 
Join Date: Jul 2015
Location: Central Florida
Posts: 127
Default

I cut and spliced the top rail 9ft back from the front and spliced in a 12ft section to add the 36 inch loft. I also framed everything up with 1x2 inch 1/16th wall box tubing. Much stronger that the z studs Supreme used and still fairly light.
All of the skin that has been removed is being replaced with new aluminum. I was planning on a repaint anyway, and why half ass it at this point.
Here is a pic of the left side with the skin replaced and windows.
Attached Thumbnails
IMG_20160119_173703.jpg   IMG_20160119_173650.jpg  
solo318 is offline   Reply With Quote