View Single Post
Old 04-15-2015, 05:18 PM   #42
Schiada
Senior Member
 
Schiada's Avatar
 
Join Date: Sep 2014
Location: Glendale
Posts: 243
Default

Started working on the rear wall . This will be removable if needed in the future ?
Their will be 2. The other will have a window. Waiting for it to get here.

The steel frame wall will bolt to the old door frame.

Where the foam is missing is where the windows for the bunk-bed's will be. Need to plot the hole and cut. Then I will do the same reinforcement I did for the other windows.
Attached Thumbnails
IMG_0956.jpg  
Schiada is offline   Reply With Quote