View Single Post
Old 12-08-2014, 07:22 AM   #14
superbird03
Senior Member
 
Join Date: Mar 2009
Location: Beloit
Posts: 120
Default

Thanks guys. If I can work on it during the week, I only get an hour or two to work so it would be too hard to get the thing warmed up to work on every time I wanted to work on it. I keep the shop at 50 and doesn't take but a 10 minutes to be as warm as I need out there. So far so good. My goal is spring for it to be functional.
superbird03 is offline   Reply With Quote