Slow and steady, started getting some of the cabinet face frames built, fridge cabinet and furnace installed. Hoping to finish the shower this week and then get the toilet in. I need to start doing some wiring so I can start installing the appliances. I bought a wrecked camping trailer that I am using the appliances and such from. I also plan to pull the electrical panel and as much of the wiring I can from it. The trailer I bought as a doner is 27', and the layout was close to what I wanted. I am hoping to uninstall and reinstall in a similar fashion.

It is cold and snowy here in Wisconsin and my garage isn't big enough for the camper so I improvised! Should work out good for the winter. With the wood wall I built insulated, I think it is more sealed up than with the garage door down. I have radiant heat in the shop floor along with a forced air furnace. it is nicer working on now that it was all summer!

Steve
Attached Thumbnails
20141019_181639_resized.jpg   20141109_164257_resized.jpg   20141127_092338_resized.jpg  
superbird03 is offline   Reply With Quote