more cabinet work
We have been working on the kitchen base cabinet. I will have three large drawers under the stove and three small drawers under the L side of the counter. The end of the L has the O2/LPG alarm near the floor and on the side facing the front of the rig is a door that can be removed to get to the under sink plumbing. All of this will need to be taken out for staining. I will be making a trip with it unfinished to make sure it will work. I also finished the four doors for the upper cabinets and have one coat of Minwax to apply.
|