Thread: Frame Welding
View Single Post
Old 08-31-2014, 12:49 AM   #377
Kenn
Senior Member
 
Kenn's Avatar
 
Join Date: Sep 2010
Location: Willamina Or
Posts: 277
Default more cabinet work

We have been working on the kitchen base cabinet. I will have three large drawers under the stove and three small drawers under the L side of the counter. The end of the L has the O2/LPG alarm near the floor and on the side facing the front of the rig is a door that can be removed to get to the under sink plumbing. All of this will need to be taken out for staining. I will be making a trip with it unfinished to make sure it will work. I also finished the four doors for the upper cabinets and have one coat of Minwax to apply.
Attached Thumbnails
IM000435.jpg   IM000439.jpg   IM000440.jpg   IM000441.jpg  
Kenn is offline   Reply With Quote