Thread: Frame Welding
View Single Post
Old 02-16-2014, 02:13 AM   #336
Kenn
Senior Member
 
Kenn's Avatar
 
Join Date: Sep 2010
Location: Willamina Or
Posts: 277
Default batteries

I got my coach batteries mounted and all of the cables hooked up. The battery rack just fits in the door. The two small 4 gauge wires go to the power center and the large 00 welding wires go to a 300 amp T fuse and on to the inverter. I can slid the battery rack out just over half way if I need to remove them but a total weight near 300# makes me grunt.
Attached Thumbnails
IM000151.jpg   IM000165.jpg   IM000150.jpg   IM000167.jpg  
Kenn is offline   Reply With Quote