Default 1/19/14 Day 158

The last minute thrash! Cold as hell but put in some long days. Got the gas lines run after going to the store 3 times to get the right parts. From the tank and regulator, the line splits with a line going to the kitchen area and a line to the front area. At each location, the line splits again. Hot water tank and stove in the kitchen, furnace and refrigerator in the front. After some testing, cussing, rewiring, all 4 appliances worked!
With a lot of help from Robert, Ryan and Matt, the upper kitchen cabinets hung, the doors hung, bathroom walls put up inside and out and a medicine cabinet hung in bathroom.
Attached Thumbnails
20140117_091006.jpg   20140120_214848.jpg   20140122_073856.jpg   20140122_073304.jpg   20140122_073417.jpg  