1/7/14 Day 146
Over the weekend, Robert got the rest of the duct work done and we installed it. Also started running the water lines and 110v lines. Then came the artic blast Monday afternoon. That's -3 at 4:30 on a sunny afternoon and dropping. With 43 degrees in the wood shop with the wood burner going, over to my pole barn I went and spend a few hours over the next two days putting poly on the doors. Yes, our 3rd shop, which has a gas furnace and is mainly used for painting. Tried the water based Minwax Acrylic for the first time. Brushed the first two coats and its easy to use, lays done pretty good and dries very fast. But you cant beat sprayed so I sanded then sprayed the last coat on the one side and and when I did the other side, I only sprayed two coats.
|