12/31/13 Day 139
Shower is complete. I know its not possible to make everything in the USA but if you make it in China, could you at least have an American with a high school education do the instructions. I lost count of the errors in them which includes the mistakes they caught and included on a separate correction sheet. Off the soapbox...
The main ceiling lights have been installed and the bunk is complete except for the molding around the edge of the opening.
Robert got the duct work fabricated and installed from the heat pump up to the ceiling. He now has to fab the part across the ceiling. Remember back at the beginning of the interior work when I said the ceiling panels were shorter than the ceiling width and you may have noticed it in some of the pics. This duct work will hide the shortage.
|