I have been making some progress on the bathroom. I got the rear wall done and I added some extra FRP inside the passengers side wall to support an awning down the road. I used the 3M VHB tape to hold it in place and when I use wood screws to mount the awning arms they will reach the FRP. I used a lot of small scraps of 2" insulation foam to fill behind the wall which will be the inside of the closet. I have run the wires for the water heater and am just about done building the wall between the bathroom and the kitchen. The furnace is mounted on another sheet of FRP so it can be slid in or out for service. The refrigerator will sit above the furnace. The two large holes in the wall are for the frig bottom and top vents.