Thread: Frame Welding
View Single Post
Old 11-20-2013, 01:22 AM   #302
Kenn
Senior Member
 
Kenn's Avatar
 
Join Date: Sep 2010
Location: Willamina Or
Posts: 277
Default making progress on "Long Leggs"

I have been making a manifold for my LPG system. I plan to install it behind the fridge in the vented area. I tapped five 1/4" NPT holes and one 3/8" NPT . The 3/8" is for the 1/2" copper supply line and three of the 1/4" will be used for 3/8" copper lines going to the stove, fridge and heater. I will have two plugged that can be used for a gauge or if someone down the road comes up with an LPG thingy that I can't live without. I also installed the LPG regulator with a servo valve that will shut if LPG is detected inside the coach. My brother and I got the shower/tub installed and are now working on the back wall.
Attached Thumbnails
IM000955.jpg   IM000959.jpg   IM000966.jpg   IM000961.jpg  
Kenn is offline   Reply With Quote