Default 11/17/13 Day 95

With good weather, we got a lot done. Side door light installed, black insert in place in the trim, all the compartment doors have been cleaned inside and out, refrigerator vent installed, bathroom vent installed and some of top clearance lights installed. Got the side door hold halfway done. Due to the compartments, it had to go part way up the door where there is nothing solid inside the door. So we are fabricating a nice piece for the inside side of the door and bolt through the catch. Nothing is simple, LOL. In my spare time, I continue installing the rigid insulation in the inside.