Thread: Frame Welding
View Single Post
Old 10-06-2013, 02:45 AM   #296
Kenn
Senior Member
 
Kenn's Avatar
 
Join Date: Sep 2010
Location: Willamina Or
Posts: 277
Default stainless trim

Well the trim is all on and it makes the outside look finished. If I counted right it took 1,134 screws to hold the trim on and about 300 were machine screws that required tapped holes, good to be done. We have had a week of heavy rain and wind but being able to work under the carport has proven to be more than doable. Yesterday the sun was out so I was able to get some better pictures. We are working on the plumbing from the shower/tub and bath sink to the holding tank. Today I ordered a hot knife to cut (melt) the insulation in an effort to reduce the mess.
Attached Thumbnails
IM000804.jpg   IM000808.jpg   IM000815.jpg   IM000812.jpg  
Kenn is offline   Reply With Quote