Thread: Frame Welding
View Single Post
Old 08-15-2013, 12:28 AM   #281
Kenn
Senior Member
 
Kenn's Avatar
 
Join Date: Sep 2010
Location: Willamina Or
Posts: 277
Default

Today my brother and I rolled the box outside and got it ready for the big lift tomorrow. We removed the casters, installed the lifting pins and then mounted the A/C unit on the roof. It all went well and was great to see it outside with the windows and trim. I though I would take it for a test drive behind the XB. With the casters you can do some wild drifting LOL. I will take lots of pictures of the lift and post them.
Attached Thumbnails
IM000657.jpg   IM000661.jpg   IM000663.jpg   IM000662.jpg  
Kenn is offline   Reply With Quote