Thread: Frame Welding
View Single Post
Old 06-28-2013, 02:11 AM   #271
Kenn
Senior Member
 
Kenn's Avatar
 
Join Date: Sep 2010
Location: Willamina Or
Posts: 277
Default last of the FRP

It took a while but all of the FRP is tapped and bolted in place. I finished the back without any drama. I still need to epoxy and glass over the roof bolts. I got a phone call from the county saying that my building permit was ready and now I can start doing the concrete work for the carport. I am not sure if I will be doing the concrete or having it done. The weather will be hot for about a week. With all the FRP on the box, my shop seems smaller and darker than ever. My printer died and the new one is giving me some challenges in trying to transfer pictures from my camera to the computer but I will try to post pictures of the back wall and the wedges I rigged up to put pressure on the center stud.
Attached Thumbnails
IM000526.jpg   IM000527.jpg   IM000531.jpg   IM000529.jpg  
Kenn is offline   Reply With Quote