Thread: Frame Welding
View Single Post
Old 05-10-2013, 01:56 AM   #257
Kenn
Senior Member
 
Kenn's Avatar
 
Join Date: Sep 2010
Location: Willamina Or
Posts: 277
Default more nutserts

I have finished drilling and installing the 49 nutserts for the drivers side. I am now up to 134 total with around 100 left to do. I had a nice visit on Monday, Dave and Michelle (Dragonslayer 140) came to take a look at the project. Lots of good questions, they make me think and I like that I can ask Dave questions and get answers that make sense. Yesterday I ordered the windows from Motion Windows in Vancouver Wa. They should be done in mid June. Tonight I cut out the opening for the small kitchen window and it went without any drama. I think I will try to trim it with a router as Dave suggested. The only flush cutter I have is not quite long enough. My sister will be out tomorrow and help with the passenger side FRP and then back to drilling.
Attached Thumbnails
IM000425.jpg   IM000425a.jpg   IM000426.jpg   IM000424.jpg  
Kenn is offline   Reply With Quote