more nutserts
I have finished drilling and installing the 49 nutserts for the drivers side. I am now up to 134 total with around 100 left to do. I had a nice visit on Monday, Dave and Michelle (Dragonslayer 140) came to take a look at the project. Lots of good questions, they make me think and I like that I can ask Dave questions and get answers that make sense. Yesterday I ordered the windows from Motion Windows in Vancouver Wa. They should be done in mid June. Tonight I cut out the opening for the small kitchen window and it went without any drama. I think I will try to trim it with a router as Dave suggested. The only flush cutter I have is not quite long enough. My sister will be out tomorrow and help with the passenger side FRP and then back to drilling.
|