Thread: Frame Welding
View Single Post
Old 04-23-2013, 11:40 AM   #252
Kenn
Senior Member
 
Kenn's Avatar
 
Join Date: Sep 2010
Location: Willamina Or
Posts: 277
Default more holes & FRP

Yesterday I got the underside of the bunk bolted in place. It took some creative use of the drill fixtures but it all worked out. I will need to remove the panel again to I can drill the holes for the front of the bunk. It is nice to be done drilling overhead. The underside FRP weighs in at 88 lbs and it is held up with 18 - 3/8" bolts which works out to under 5 lbs per bolt.
Attached Thumbnails
IM000384.jpg   IM000386.jpg   IM000388.jpg   IM000390.jpg  
Kenn is offline   Reply With Quote