Thread: Frame Welding
View Single Post
Old 04-06-2013, 01:47 AM   #239
Kenn
Senior Member
 
Kenn's Avatar
 
Join Date: Sep 2010
Location: Willamina Or
Posts: 277
Default

Michael today I called the county and was able to get a date for the public hearing. I have to put a sign in my yard before April 17 and the hearing will be on April 30. The county needs to run an add in the newspaper for twenty days before the hearing. The carport is still a ways off. After the hearing they will determine if I will be granted a variance. One I get the variance then I can apply for the building permit. The variance application cost $1,025. and I don't know what the building permit will cost but the engineered drawings are $1,350. Longs Legs (that is the name of my motorhome) is going to be parked under an expensive carport.
Kenn is offline   Reply With Quote