Finally found some time to work on the toter. Have three sides covered. Awaiting rivet shipment to finish the last side. Installed 3/4" plywood on the roof after insulating. Ready for one piece alum roof. Currently building the lower access door frames from 1" square tubing. The doors will be covered with polished 1/8" alum deck plate. Progress!