mmmc is probably about right @ 5". It depends a lot on the type of soil that will be under it. Your concrete will not be much better than the base it is poured on. Use 3500-4000# with fiver for the "easiest" job.
__________________
AndyG
1989 FLD120 with 2000 NRC conversion
|