Thread: Frame Welding
View Single Post
Old 03-25-2012, 11:53 AM   #116
Kenn
Senior Member
 
Kenn's Avatar
 
Join Date: Sep 2010
Location: Willamina Or
Posts: 277
Default sheet metal work

Yesterday I finished fabricating a storage space for my shore-power cord. I used a six inch deep area above the exhaust to save room in the compartment. It was a three day project that included a lot of drilling, welding, sheet metal cutting and head scratching. I think it will work pretty good. I mounted the rubber fender lips and started making a filler plate to cover the eight inch hole below the entry steps when they are retracted for travel. Yesterday was the first day without rain or snow in about a week so I was able to move the truck outside and get better pictures. Next up is to mount the camper frame to casters and store it outside until later. Once the camper frame (floor & roof frame) is out of the way I will remove the lower unit and start getting it ready to paint.
Attached Thumbnails
IM000544.jpg   IM000545a.jpg   IM000548.jpg   IM000542.jpg  
Kenn is offline   Reply With Quote