Thread: Frame Welding
View Single Post
Old 03-12-2012, 04:05 PM   #114
Kenn
Senior Member
 
Kenn's Avatar
 
Join Date: Sep 2010
Location: Willamina Or
Posts: 277
Default Motivation

Dave thanks for the kind words. Your visit has motivated me to keep plugging along. You asked a lot of good questions. I have been spending time in the planning of the sidewall (FRP) installation. I will clamp one sidewall to the frame and drill .5" holes at four places in the roof frame. I will use .5 steel rods 10' long and run the rods from one side to the other with about nine inches sticking out on each side. Now I will be able to hang the FRP from the rods while I add the glue to the wall studs and frame. After both sides are glued and screwed to the frame I can pull the rods out and fill the holes in the FRP.
Kenn is offline   Reply With Quote