Thread: Frame Welding
View Single Post
Old 02-19-2012, 01:59 AM   #108
Kenn
Senior Member
 
Kenn's Avatar
 
Join Date: Sep 2010
Location: Willamina Or
Posts: 277
Default Tech-Edge monitor

Today I epoxied the aluminum strips and copper pads to the inside of the end panel. I drilled a hole and then made small cuts with a hand saw to pass the copper pads through without cutting any wires. I stuck the sensor module to the outside. I used 3" cloth tape and then 4" cloth tape followed with a full layer of cloth. No if I ever needed to change out the sensor it would be possible without going inside the tank. Next up is all of the inlets 1 1 1/2" vent, 2 1 1/2" drains and a 3" toilet going in with a 3" dump valve going out.
Attached Thumbnails
IM000434.jpg   IM000440.jpg   IM000439.jpg   IM000444.jpg  
Kenn is offline   Reply With Quote