Thread: Frame Welding
View Single Post
Old 11-19-2011, 01:39 PM   #58
Kenn
Senior Member
 
Kenn's Avatar
 
Join Date: Sep 2010
Location: Willamina Or
Posts: 277
Default Sheet metal

I am doing as much fab work as I can before the roll-up doors arrive. I finished the exhaust and did the wheel wells. I made the framing for one compartment (the only compartment that I can finishe before the entry door and steps arrive) and clamped it in place. I drilled and clamped the sheet metal (16 g) for the fuel tank cover, and rear end of the motor-home. I did the back while my brother was visiting because that rear piece is big and hard to handle by myself. We got it fitted and drilled the hole for the lights. My roll-up doors are due in on Tuesday and the Kwikee steps and entry door will be in on Monday. Next week will be fun.
Attached Thumbnails
IM000285.jpg   IM000294.jpg   IM000288.jpg   IM000292.jpg  
Kenn is offline   Reply With Quote