I can confirm the long wait on the M2. I still have another 7 weeks until I get mine just to start the 6 week build process. My truck was ordered on 11/19/04. From what I understand the leadtime on the M2 is only getting longer, so if your planning a conversion to arrive before the end of the year, ya better get a truck on order.
BTW: My truck has the MBE 926 motor but rated to 300hp & 860 ftlbs. Not sure what it would take to bump it up, also not worried about, but it's a option down the road.
__________________
2012 Showhauler 28'6" Motorhome on a Columbia w/ 450 Mercedes.
|