View Single Post
Old 09-26-2005, 04:40 AM   #6
anthony desnick
Member
 
Join Date: Sep 2005
Location: Twin Cities, MN
Posts: 54
Default

Thanks for the comments.

Wood cabinets are particle board with melamine finish and solid birch doors/laquer doors where white. Wires were routed through the floor space in conduit and up between framing members. Insulation is 1/2" in wall and ceiling and 3/4" in floor with insulated glass windows. We pre-wired for gen and owner installed a 5500 diesel onan. We customize every coach. I'm trained as an architect with over 30 years of practice under my belt. Boxes are steel in this one. I think aluminum is a better solution especially under the tanks.
anthony desnick is offline   Reply With Quote