Thread: 92 frieghtliner
View Single Post
Old 02-01-2006, 12:56 AM   #9
RBlack
Junior Member
 
Join Date: Aug 2005
Posts: 29
Default

Well looks like I got about 55 hours to date. 1/31. I had someone else do the frame ext. (strongly recomended)$5k for the ext. and moving the tires back one set of holes. The subframe and floor went on very quick, one Saturday. Then came the corner posts and walls. Getting everything perfectly square when it is vertical is a little more time consuming. Thanks for the advice on covering the cab. I need to cover my cab opening. My front windows are pretty bad already, prior to me buying the truck. I lucked out on the air lines, no holes yet. As soon as I get it framed, I'll pull it off the truck to sheet against the cab.
RBlack is offline   Reply With Quote