Registered: August 2002 Location: N.E. Ohio Posts: 768
Tons of metal! Literally. Floor and bin framing is in 2" x 3" tubular steel. The wall and roof are 1" x 3" tubular steel and 16" on center where possible. The red tape on the frame is the bonding tape by 3M used to secure the panels to the tubular steel. No rivets are required giving a smooth side and once those panels go on they aren't coming off.